Toronto · Washroom Renovations · Tile · Floors

Bathroom renovations done by hand.

Phil runs every project personally — quotes it, builds it, stays on call after. A small Toronto crew, one name on every job.

20 years on the toolsWSIB registeredFully insured
Carrara marble walk-in shower — master bathroom renovation by Blue Tile & Marble
Calacatta marble walk-in shower — finished master bathroom by Blue Tile & Marble

Featured project

Calacatta marble master bath

  • 20 years on the tools

    Two decades of Toronto installs

  • Fully insured

    Certificate available on request

  • WSIB registered

    Active on every job

  • Schluter Kerdi standard

    Membrane on every wet wall

Materials & technique

Why our installs hold up.

Premium contractors aren’t separated by what they install. They’re separated by what they install underneath — the prep, the membranes, the patience. Here’s a piece of what we do that you don’t see when the job’s finished.

  1. 01Stone

    Carrara, Calacatta, Bardiglio.

    We work in Italian marble from the Apuan Alps quarries that supplied Michelangelo. We know which slabs vein-match for a continuous look across a wall, and we plan layout before the saw comes out. We don’t substitute and we don’t fudge. Italian marble isn’t a material to us — it’s what Felice grew up around.

  2. 02Waterproofing

    Schluter Kerdi on every wet wall.

    Every wet zone gets a full Kerdi membrane, taped at every seam, with sealed corners and a Kerdi-Drain assembly. It’s invisible after install. It’s the difference between a shower that stays good for 20 years and one that needs gut-out at year 7.

  3. 03Proof

    24-hour flood test before tile.

    Before a single tile goes on, we plug the drain and flood-test the membrane for 24 hours. If it holds, we tile. If it doesn’t, we fix it now — not after your floor is done. Most contractors skip this. We document it.

  4. 04Precision

    2 mm joints. Levelling clips on anything ≥12".

    Tile lines that line up across rooms aren’t an accident. Every job dry-fits before mortar. Every large-format tile goes in with a levelling system. Lippage you can feel with bare feet doesn’t happen on our jobs because we don’t let it.

Watch the work

60 seconds of craftsmanship.

Photos show the finished room. These show the work that decides whether it lasts. Two minutes total, worth the watch.

Phil installing Schluter Ditra uncoupling membrane on a floor before tile

Schluter Ditra uncoupling membrane laid before tile.

The orange waffle membrane that lets a tile floor flex with the house instead of cracking when the subfloor moves. Goes down before a single tile.

Phil installing small-format mosaic on a shower pan over Mapei AquaDefense waterproofing

Mosaic shower pan, set on full waterproofing membrane.

Blue Mapei AquaDefense and HydroBan underneath. Then trowel-notched mortar. Then mosaic, set tile by tile to the chalk line.

Trade-grade materials we install with

Schluter SystemsKerdi-DrainMapeiLaticreteDitra-HeatDMXOlympia TileCeragresCentura TileStone Tile

What we do

Four service lines, one Toronto crew.

From a single shower to a full master-bath renovation — and the stone care that keeps it looking new — you get one schedule, one standard, and one phone number for the whole job.

Full Washroom Renovation

Demo to finish — small ensuites to full master suites, run as one project.

  • ·Full demo and disposal
  • ·Framing changes for layout improvements
  • ·Plumbing & electrical trade coordination

Tile & Stone Installation

Marble, porcelain, mosaic, natural stone — bathrooms, kitchens, floors.

  • ·Marble, porcelain, ceramic, mosaic, natural stone
  • ·Wall, floor, shower, kitchen backsplash, feature walls
  • ·Schluter waterproofing systems

Framing

Bathroom, kitchen and structural framing — square, plumb, solid.

  • ·Bathroom and kitchen framing
  • ·Basement framing with vapor / moisture barriers
  • ·Structural changes & load-bearing modifications (with engineer where required)

Stone Care & Restoration

Re-seal, re-grout, restore — keep your marble looking new for decades.

  • ·Marble & natural stone re-sealing (every 18–24 months)
  • ·Grout deep-cleaning, haze removal, repair
  • ·Tub/shower caulk replacement

How a job runs

From the first walkthrough to the last grout line.

01

Walk the space

Free consultation in your home. We listen to what you want, look at what’s actually there, and talk realistic scope.

02

Real quote

Line-itemed, with material allowances, schedule, and trade coordination spelled out. Five business days. No moving target.

03

Build it properly

On-site daily. Demo, framing, waterproofing, tile, finish — done in sequence. A text every evening with what got done.

04

Walk it together

Punch list resolved before we leave. Care notes for your stone, our number for after. We answer the phone.

Phil, founder of Blue Tile & Marble, on a Toronto framing job site

About

Phil’s on every job site, every day.

Blue Tile & Marble is a small Toronto crew. Phil quotes the job and Phil’s on-site doing it — no hand-offs to a crew you’ve never met, no “site supervisor” you can’t reach.

We take on what we can do well. We don’t run three jobs at once. The standard doesn’t bend depending on whose house we’re in.

Service area

Toronto and the GTA — neighbourhood by neighbourhood.

Most of our work is in Toronto and the inner GTA. If your project is outside this radius, get in touch — we usually say yes.

Cities we serve

  • Toronto
  • Etobicoke
  • North York
  • Scarborough
  • Mississauga
  • Vaughan
  • Markham
  • Richmond Hill
  • Oakville
  • Burlington

Toronto neighbourhoods

  • Riverdale
  • The Beaches
  • Leaside
  • Forest Hill
  • Rosedale
  • Yorkville
  • The Annex
  • High Park
  • Roncesvalles
  • Bloor West
  • Lawrence Park
  • Davisville
Outside this radius? Ask us

Common questions

Everything we get asked.

Cost, timeline, warranty, the work that happens behind the wall — the answers most homeowners want before they pick up the phone.

Don’t see your question? Call or text — we answer ourselves.

  1. Every project is different — there’s no honest fixed number. A small ensuite is a different job than a master suite with marble and structural changes. After we walk the space, you get a real line-itemed quote within five business days — not allowance-loaded, not a moving target. We tell you up front what the project is going to be, then we hold to it.

Ready when you are

Tell Phil about your project.

Free, no-pressure consultation. We come on-site, walk the space, and send a real quote within five business days.