
Schluter Ditra uncoupling membrane laid before tile.
The orange waffle membrane that lets a tile floor flex with the house instead of cracking when the subfloor moves. Goes down before a single tile.
Toronto · Washroom Renovations · Tile · Floors
Phil runs every project personally — quotes it, builds it, stays on call after. A small Toronto crew, one name on every job.


Featured project
Calacatta marble master bath
20 years on the tools
Two decades of Toronto installs
Fully insured
Certificate available on request
WSIB registered
Active on every job
Schluter Kerdi standard
Membrane on every wet wall
Featured work
Materials & technique
Premium contractors aren’t separated by what they install. They’re separated by what they install underneath — the prep, the membranes, the patience. Here’s a piece of what we do that you don’t see when the job’s finished.
We work in Italian marble from the Apuan Alps quarries that supplied Michelangelo. We know which slabs vein-match for a continuous look across a wall, and we plan layout before the saw comes out. We don’t substitute and we don’t fudge. Italian marble isn’t a material to us — it’s what Felice grew up around.
Every wet zone gets a full Kerdi membrane, taped at every seam, with sealed corners and a Kerdi-Drain assembly. It’s invisible after install. It’s the difference between a shower that stays good for 20 years and one that needs gut-out at year 7.
Before a single tile goes on, we plug the drain and flood-test the membrane for 24 hours. If it holds, we tile. If it doesn’t, we fix it now — not after your floor is done. Most contractors skip this. We document it.
Tile lines that line up across rooms aren’t an accident. Every job dry-fits before mortar. Every large-format tile goes in with a levelling system. Lippage you can feel with bare feet doesn’t happen on our jobs because we don’t let it.
Watch the work
Photos show the finished room. These show the work that decides whether it lasts. Two minutes total, worth the watch.

The orange waffle membrane that lets a tile floor flex with the house instead of cracking when the subfloor moves. Goes down before a single tile.

Blue Mapei AquaDefense and HydroBan underneath. Then trowel-notched mortar. Then mosaic, set tile by tile to the chalk line.
Trade-grade materials we install with
What we do
From a single shower to a full master-bath renovation — and the stone care that keeps it looking new — you get one schedule, one standard, and one phone number for the whole job.
Demo to finish — small ensuites to full master suites, run as one project.
Marble, porcelain, mosaic, natural stone — bathrooms, kitchens, floors.
Bathroom, kitchen and structural framing — square, plumb, solid.
Re-seal, re-grout, restore — keep your marble looking new for decades.
How a job runs
Free consultation in your home. We listen to what you want, look at what’s actually there, and talk realistic scope.
Line-itemed, with material allowances, schedule, and trade coordination spelled out. Five business days. No moving target.
On-site daily. Demo, framing, waterproofing, tile, finish — done in sequence. A text every evening with what got done.
Punch list resolved before we leave. Care notes for your stone, our number for after. We answer the phone.

About
Blue Tile & Marble is a small Toronto crew. Phil quotes the job and Phil’s on-site doing it — no hand-offs to a crew you’ve never met, no “site supervisor” you can’t reach.
We take on what we can do well. We don’t run three jobs at once. The standard doesn’t bend depending on whose house we’re in.
Service area
Most of our work is in Toronto and the inner GTA. If your project is outside this radius, get in touch — we usually say yes.
Cities we serve
Toronto neighbourhoods
Common questions
Cost, timeline, warranty, the work that happens behind the wall — the answers most homeowners want before they pick up the phone.
Don’t see your question? Call or text — we answer ourselves.
Every project is different — there’s no honest fixed number. A small ensuite is a different job than a master suite with marble and structural changes. After we walk the space, you get a real line-itemed quote within five business days — not allowance-loaded, not a moving target. We tell you up front what the project is going to be, then we hold to it.
Ready when you are
Free, no-pressure consultation. We come on-site, walk the space, and send a real quote within five business days.